Overview
Location
Eastern Athabasca Basin, Saskatchewan, Canada
Ownership
100% IsoEnergy
Deposit Type
Unconformity related sandstone and basement hosted uranium
Stage
Exploration
Primary Minerals
Uranium
December 17, 2019
IsoEnergy Plans Aggressive Twenty Hole Winter Drilling Program at the Hurricane Uranium Zone
December 3, 2019
IsoEnergy Closes Bought Deal Private Placement of FT Shares for C$3.50 Million and Announces Increase to Non-Brokered Portion of the Private Placement
November 20, 2019
IsoEnergy Finalizes Uranium Target Areas for Winter Drilling; Notes Increasing Uranium Price in Spot Market
November 12, 2019
IsoEnergy Announces Bought Deal Private Placement of FT Shares for C$3.50 Million and a Concurrent Non-Brokered Private Placement of Units purchased by NexGen Energy for C$2.65 Million
October 1, 2019
IsoEnergy Intersects 1.6% U3O8 over 10.5m in Drill Hole LE19-28, Including 12.6% U3O8 over 1.0m
August 28, 2019
IsoEnergy Intersects Additional Uranium Mineralization at the Hurricane Zone and Identifies New Target Areas
July 25, 2019
IsoEnergy Intersects 5.4% U3O8 over 7.0m in Drill Hole LE19-16A, Including 15.9% U3O8 over 2.0m
July 11, 2019
IsoEnergy Intersects Strong Uranium Mineralization in 100m Step-out at the Hurricane Zone
June 25, 2019
IsoEnergy Intersects 5.5m of Uranium Mineralization in First Drill Hole of Summer Program at the Hurricane Zone
April 24, 2019
IsoEnergy Begins DC-Resistivity Geophysical Survey at the Larocque East Uranium Property
April 16, 2019
IsoEnergy Drills 8.5m of 3.2% U3O8 in Drill Hole LE19-12, Including 1.0m of 14.3% U3O8 at the Hurricane Zone
April 1, 2019
IsoEnergy Drills 4.5m of 4.2% U3O8 in Drill Hole LE19-09 at the Hurricane Zone High-Grade Uranium Discovery
March 20, 2019
IsoEnergy Continues to Intersect Strong Pitchblende Uranium Mineralization in Step-out Drilling Confirming over 150 m of Strike Extent at the Hurricane Discovery
February 28, 2019
IsoEnergy Drills 4.0 m of 3.8% U3O8 in 30 m Step-out to the East and Intersects Strong Radioactivity in 30 m Step-Out Hole to the West, Mineralization Remains Open Along Strike
February 13, 2019
IsoEnergy Drills 3.5 metres of 10.4% U3O8 including 0.5 metres of 38.2% U3O8 in Drill Hole LE19-02 at the Hurricane Zone
February 11, 2019
IsoEnergy Intersects Strong Pitchblende Uranium Mineralization in First Along-Strike Step-out at the Hurricane Zone